Skip to content

Spending and your limits

Two ceilings, and both are yours to change. A day: nothing runs past this in one day, across all your workspaces — $50 to begin with. A month: a ceiling on a calendar month, which starts off unset.

A step a limit refuses is not run and costs nothing. When one is in the way the Studio says which, and raising it is one field and one press; nothing you have made is lost, and everything free — trimming, reordering, writing your own words, playing the whole thing in the browser — goes on working while you decide.

What you have bought lists each lot of credit: when it was added, how much, what is left and when it expires. Every movement lists the latest twelve changes to your balance, with the workspace each spend was made in.

Every call it has paid for lists each call: when, what it was, which service made it, whether it worked, what it read and wrote, how long it took, and what it cost. Held means money set aside while the call runs. Everything, Running and Failed filter the list.

Above the list, the latest refusals say why something was not run: there was not enough credit, your daily or monthly limit was reached, the post reached its own cap, it was tried three times and stopped, or it took too long and was stopped.